Umraniye-Atasehir-Goztepe Metro Line
Project Information
  • Project Date 2020-2023
  • Project Type METRO LINE
  • Employer ISTANBUL METROPOLITAN MUNICIPALITY/GULERMAK- NUROL- MAKYOL
  • Area ATASEHIR + FINANCIAL CENTER + SITE + SAHRA STATIONS + LINE LENGTH (200.000 m²)²
  • Project Location ATASEHIR/İSTANBUL
  • Label Clean Water, Waste Water, Fire Installation, Ventilation Installation, Compressed Air Installation, Air Conditioning Installation
  • Implemented Service 1 Construction of Tunnel and Station Smoke Extraction Systems
  • Implemented Service 2 Construction of Tunnel and Station Ventilation Systems
  • Implemented Service 3 Construction of Fire Hydrant Systems Along the Tunnel Line
  • Implemented Service 4 Construction of Underground and Stormwater Drainage Systems Along the Tunnel Line
  • Implemented Service 5 Performing Plumbing Works
  • Implemented Service 6 Construction of Fire Installations
  • Implemented Service 7 Ventilation Installations
  • Implemented Service 8 Construction of Compressed Air Installations
  • Implemented Service 9 Construction of Air Conditioning Systems